What your resources change, and what they don't
Resources change what is reachable; they never make an invalid method valid for the same research question.
Fit
When it matters, and when it does not
It matters when
- You need to match recruitment, data access, skills, software and time to a defensible plan.
- The proposed analysis requires support your team does not yet have.
It matters less when
- You want to weaken a method while keeping the same claim. Obtain support or narrow the question instead. Read: Choosing a study design from the research question
- You only need a clearer explanation of the chosen target. Define the estimand in plain language. Read: The estimand
Before you start
What to check in your study
- People, funding, data access and softwareName who will do each task and what is actually available. Multiple data sources do not by themselves mean record linkage.
- The deadline and what must be finishedA proposal deadline is different from a deadline for completed follow-up and results.
- The scientific requirement follows from the question and design.How to check: Name the needed support or propose a narrower defensible question. Do not quietly drop clustering, confounding control or missing-data assumptions.
- Available records contain the measurements needed for the chosen claim.How to check: Analysis-ready data skip acquisition work only. They do not establish valid measurements, adequate follow-up or causal identification.
Plain language
How it works
Work out a defensible approach first. Then assess access, workload, cost, skills and timing. A pilot can study whether the main study is feasible; it does not establish the main treatment effect.
Mallard treats Not sure yet as an answer, not a statement that no support or data exist. Unstated funding is not treated as unfunded. Its context checks flag typed conflicts, such as new randomization with already collected outcomes, and ask the investigator to resolve them. Funding and team can raise the drafting route; they cannot lower the route required by study complexity.
Worked example
A worked example
- Setting
- A clinic has permission to review 100 records before a deadline.
- Question
- Does this guarantee enough information for an effect study?
- Approach
- An audit finds that 60 records contain the required outcome.
- Result
- Only 60 of 100 records, or 60 in 100, have that outcome recorded.
- What it means
- This describes completeness. The team must assess missingness and attainable precision, obtain more support or change the question before claiming an effect.
In practice
Recent studies PubMed search · not vetted
Watch out
Common mistakes
The one to remember
Context governs feasibility, never validity. Limited time, funding or software cannot make an analysis adequate for a claim it cannot support.
- Using an independent analysis because clustered software is unavailable.Instead: Obtain suitable support or change the design or question. A spreadsheet does not remove dependence.
- Treating an unstated budget as no funding.Instead: Leave unknown funding unknown. State a level only when the investigator has supplied it.
Inside Mallard
How Mallard uses this
Mallard uses context to assess feasibility and explain support needs. Funding and team can route drafting upward; they do not lower the scientific requirement.
concept.resources_and_validity, the id a plan cue records.Related Learn pages
Related designs and methods
Evidence
Sources & further reading
- Defining Feasibility and Pilot Studies in Preparation for Randomised Controlled Trials: Development of a Conceptual Framework. (opens in a new tab) · PLoS One · doi 10.1371/journal.pone.0150205
- Data sharing and reanalysis of randomized controlled trials in leading biomedical journals with a full data sharing policy: survey of studies published in The BMJ and PLOS Medicine. (opens in a new tab) · BMJ · doi 10.1136/bmj.k400